Preparing for Inspection — Making Friends with the Fire Marshal

Posted on May 7, 2019 3:03:16 PM

Fire codes are enforced to maintain facilities in a fire-safe manner and protect extractors. Marijuana extraction facilities, in particular, use flammable solvents and other hazardous materials during extraction processes that require stringent regulations.

The fire marshal can visit an extraction facility at any time, so it is vital to stay on top of the fire code requirements to pass inspection. Any fire inspector's goal is to reduce the risk to life and property. Extractors can use this handy checklist to help them prepare and pass their inspection.

Continue Reading

Extraction Facility Requirements to Keep Processors Compliant

Posted on May 6, 2019 2:31:00 PM

Extraction facilities use various methods, each with unique processes and building requirements. An extraction facility must meet applicable building code guidelines, equipment requirements, and safety regulations in order to gain approval to operate. Denial of an application for an extraction facility can typically be appealed through a hearing within a certain period of time.

While certainly not exhaustive, here are some general guidelines that can be applied to most jurisdictions. Following these guidelines will not ensure regulatory compliance but are a good starting point for obtaining approval.

Continue Reading

6 Commonly Overlooked NFPA Regulations for Marijuana Extractors

Posted on May 3, 2019 1:18:34 PM

Fire safety professionals developed new building and life safety codes to keep up with the ever-changing cannabis industry. The National Fire Protection Association (NFPA) added Chapter 38, "Marijuana Growing, Processing, or Extraction Facilities," to the 2018 Edition of NFPA 1 Fire Code to address common marijuana production hazards.

Continue Reading

IO Extractor

io-extractor-blog-sidebar

Cut Labor Costs
Automated controls eliminate weeks or months of apprenticeship training required for manually controlled hydrocarbon systems.

Eliminate Operator Error
Pre-programmed recipe-monitoring system checks pressures and temperatures hundreds of times per second to remove risk of operator error.

Increase Capacity
Process 18 pounds of dried plant material or 25 pounds of fresh-frozen material per run. Single operator can process 400 pounds of biomass in a single day.

Improve Run Time
50-minute average run time with a 10-minute soak. Run-to-run changeover times of two minutes.

Reserve Yours Today

Recent Posts